Results

Total Results: over 10,000 records

Showing results for "planned".

  1. psnet.ahrq.gov/issue/characterising-nature-primary-care-patient-safety-incident-reports-england-and-wales-national
    December 16, 2015 - Delivery of Surgical Services: a Programme of Controlled Before-and-after Intervention Studies with Pre-planned
  2. digital.ahrq.gov/health-it-tools-and-resources/workflow-assessment-health-it-toolkit/research/mollon-b-et-al-2009
    January 01, 2009 - Statistical analysis of associations between system features and success of outcomes was planned.
  3. digital.ahrq.gov/ahrq-funded-projects/massachusetts-quality-e-measure-validation-study
    January 01, 2023 - The project team was unable to complete the planned comparative analysis as had been proposed at the
  4. digital.ahrq.gov/ahrq-funded-projects/metro-dc-health-information-exchange-medhix
    January 01, 2023 - Provider feedback on actual HIE utility was planned post implementation.
  5. digital.ahrq.gov/ahrq-funded-projects/state-and-regional-demonstration-health-information-technology-ri
    January 01, 2023 - It was planned from the onset that once the HIE was operational it would be managed and maintained outside
  6. digital.ahrq.gov/ahrq-funded-projects/ambulatory-care-compact-organize-risk-and-decisionmaking-accord
    January 01, 2023 - evaluate the ACCORD system in the largest primary care practice at Massachusetts General Hospital was planned
  7. psnet.ahrq.gov/web-mm/dangerous-shift
    July 24, 2013 - This case highlights a common scenario: a planned patient transfer that gets delayed until after a shift … Directly transferring patients to planned specialties (e.g., skip the emergency department of a second … Relation of real-time events to planned milestones.
  8. effectivehealthcare.ahrq.gov/sites/default/files/study-size-planning-chapter-9.pptx
    January 01, 2013 - funding agencies, and ethics review boards can make informed decisions about the potential utility of the planned … For a well-planned and conducted randomized controlled trial, the type I and type II errors rank higher … Specify the expected precision (or statistical power) for any planned subgroup analyses.
  9. psnet.ahrq.gov/web-mm/double-never-event-wrong-patient-and-wrong-side
    August 20, 2018 - with appropriate explanation) to the covering resident, and the absence of clear documentation of the planned … events, including wrong site and wrong patient procedures. 9 Proper Time-Out Procedure Time-outs are planned … a mean duration of 36 seconds. 10 A time-out should consist of confirming the correct procedure is planned
  10. digital.ahrq.gov/sites/default/files/docs/improve-medication-management-slides-091318.pdf
    September 27, 2018 - • Send electronic message to PCP/specialist with planned outpatient regimen. … Planned pillbox enhancements; optimizing location of the pillbox within the home. … Group medications for each dose if possible; planned pillbox enhancements to detect one small pill.
  11. cds.ahrq.gov/sites/default/files/workgroups/251/aug-2017-cholesterol-wg-notes.docx
    January 01, 2017 - CAMH planned to email the link to the Repository to the WG members after the close of the meeting.
  12. digital.ahrq.gov/sites/default/files/docs/citation/r18hs026170-garcia-final-report-2023.pdf
    January 01, 2023 - minimum n=4,000 cases) and a human subjects sub-study (planned n=1,000 patients), respectively … Evidence-based Implementation Strategies (FRAME-IS)(43) and when new strategies are added, either as planned … As a result, we were not able to evaluate all planned implementation strategies. … Most strategies (n=28) were prospective (i.e., planned to be used a priori as part of study protocol … Submitted/Planned Manuscripts: 6.
  13. Psn-Pdf (pdf file)

    psnet.ahrq.gov/node/49791/psn-pdf
    April 01, 2017 - causes include lack of adherence to protocols, deficiency in education, lack of experience in the planned … patient consent includes a discussion and documentation of benefits, risks, and alternatives to the planned
  14. Appendixb (pdf file)

    digital.ahrq.gov/sites/default/files/docs/page/AppendixB.pdf
    February 01, 2012 - Go-live personnel needs have been planned for. 1-not at all, 5-completely Notes: Project Assessment … On-going project assessment has been planned and budgeted for. 1-not at all, 5-thoroughly … Evaluation Toolkit: http://healthit.ahrq.gov/tools_and_resources Final project assessment has been planned
  15. psnet.ahrq.gov/issue/high-prevalence-medication-discrepancies-between-home-health-referrals-and-centers-medicare
    December 23, 2011 - 23, 2020 A clinical pharmacist-led transitions of care program for veterans with two planned
  16. digital.ahrq.gov/ahrq-funded-projects/pharmaceutical-safety-tracking-phast-managing-medications-patient-safety/annual-summary/2010
    January 01, 2010 - Initial recruitment was slower than originally planned, but participant retention is relatively high.
  17. digital.ahrq.gov/ahrq-funded-projects/improving-medication-management-practices-and-care-transitions-through/annual-summary/2011
    January 01, 2011 - Two sets of analyses were planned.
  18. hcup-us.ahrq.gov/datainnovations/clinicalcontentenhancementtoolkit/mn5.pdf
    June 21, 2014 - Phase 1 Pharmacy Datay • Evaluation of Phase 1 pharmacy data will – focus on drugs related to the planned
  19. digital.ahrq.gov/ahrq-funded-projects/health-information-technology-center-education-and-research-therapeutics/annual-summary/2011
    January 01, 2011 - Currently, three projects are planned for HIT-CERT's 5-year duration: e-Pharmacovigilance II: Surveillance
  20. Psn-Pdf (pdf file)

    psnet.ahrq.gov/node/49802/psn-pdf
    August 01, 2017 - The gastroenterologist planned to perform an esophagogastroduodenoscopy (EGD) with biopsy the following … patient is made, and the timing for cessation and recommencement of antithromboembolic precautions are planned