Results

Total Results: 688 records

Showing results for "phase".

  1. digital.ahrq.gov/ahrq-funded-projects/showing-health-information-value-community-network
    January 01, 2023 - , or patient reminder; plus three groups that did not receive an intervention for the study's first phase … During a second phase, health issues pertaining to aspects of care "omitted" from a patient's care management … In addition, the first phase of the study was extended from six months to nine to allow more time for … Consequently, the project phase in which clinicians were to receive only two interventions was dropped
  2. digital.ahrq.gov/ahrq-funded-projects/veterans-administration-va-integrated-medication-manager/annual-summary/2011
    January 01, 2011 - In the first phase of the project, physicians, mid-level providers, and pharmacists were followed during … The second phase of the project evaluated the IMM software using test cases in simulation studies.
  3. digital.ahrq.gov/ahrq-funded-projects/automatic-notification-system-test-results-finalized-after-discharge/annual-summary/2012
    January 01, 2012 - In the first phase of this study, components of the system were developed to: 1) identify tests with … In the second phase, a cluster-randomized, 8-month controlled trial measured the impact of this system
  4. digital.ahrq.gov/sites/default/files/docs/citation/r18hs022065-kroth-final-report-2018.pdf
    January 01, 2018 - Methods: Phase 1: conduct focus groups at three institutions that use three different EHRs vendors to … Phase 2: Conduct a survey of 450 clinicians to drill down on the results from Phase 1. … 2): The output of Phase 1 of the study (the focus groups) informed the design of the survey instrument … Survey (Phase 2): Wave 2 of the survey closed July 31, 2017. … Health Information and Communications Technologies Final Report PI: Kroth PAGE 10 Survey (Phase
  5. digital.ahrq.gov/sites/default/files/docs/publication/r01hs015057-lobach-final-report-2008.pdf
    January 01, 2008 - Detailed demographic data for subjects enrolled in Phase I are summarized in Table 4 by study arm along … Notifications generated during the 9-month Phase I period from September 2006 through May 2007 Focus … 1 Dates: 9-2006 to 5-2007 Duration: 9 Months Study Cycle: Phase 2 Dates: 6-2007 to 12-2007 … When we were validating our preliminary analyses for Phase 2 and 3, we discovered some unexplainable … Table 12: Primary clinical and economic outcomes from Phase 1 (results show the mean followed by the
  6. digital.ahrq.gov/sites/default/files/docs/care-transitions-qas-092619.pdf
    September 26, 2019 - ANSWER: Our initial beta test (first phase of our AHRQ-funded R21) was in 2017, and the feasibility … study (phase 2) was in 2018; both tested an Android-only app. … ANSWER: The technical issues we encountered during the feasibility study (second phase of the project … (phase 2) was in 2018; both tested an Android-only app. … ANSWER: The technical issues we encountered during the feasibility study (second phase of the project
  7. digital.ahrq.gov/sites/default/files/docs/publication/r18hs017042-forrest-final-report-2011.pdf
    January 01, 2011 - Study sample Sample Characteristics Pre-CDS Phase (12 mos) Post-CDS Phase (21 mos) TOTAL … Two practices left the primary care network for reasons unrelated to this study during the post-CDS phase … Unadjusted change scored (Post-phase proportion minus Pre-phase proportion) results can are shown in … Controlling on patient covariates, the odds of prescribing high dose amoxicillin during the post-CDS phase … intermediate users. 13 Figure 8 below shows the tool use over the 21 month Post-Intervention phase
  8. digital.ahrq.gov/ahrq-funded-projects/healthy-teens-txt-me-information-technology-change-teen-health-risk-behaviors/annual-summary/2011
    January 01, 2011 - In Phase One of the study, participants were offered counseling about exercise during office visits. … In Phase Two, intervention arm participants received 6 weeks of brief daily text messages to provide
  9. digital.ahrq.gov/ahrq-funded-projects/improving-rural-health-care-implementing-innovative-integration-solutions/annual-summary/2008
    January 01, 2008 - organizational policies for user access to data. ( Achieved ) 2008 Activities: In 2008, the third phase … This phase was also identified as the period to implement Secure Socket Layer security to enable Web-based
  10. digital.ahrq.gov/ahrq-funded-projects/improving-meaningful-access-internet-health-information-older-adults
    January 01, 2023 - In the second phase, a randomized trial was conducted in which the intervention group had access to the
  11. digital.ahrq.gov/ahrq-funded-projects/context-aware-knowledge-delivery-electronic-health-records/annual-summary/2010
    January 01, 2010 - screened in the first round and yielded 718 full-text articles that met the criteria for the second phase … some of the knowledge-delivery service infrastructure, and the project entered into a system testing phase
  12. digital.ahrq.gov/ahrq-funded-projects/veterans-administration-va-integrated-medication-manager/annual-summary/2010
    January 01, 2010 - In the first phase of the project, physicians, mid-level providers, and pharmacists were followed during … The second phase of the project evaluates the IMM software using test cases in simulation studies.
  13. digital.ahrq.gov/ahrq-funded-projects/virtual-continuity-and-its-impact-complex-hospitalized-patients-care/annual-summary/2011
    January 01, 2011 - addition, the number of patients from whom they are able to obtain consent in the post-intervention phase … addition, the number of patients from whom they were able to obtain consent in the post-intervention phase
  14. digital.ahrq.gov/sites/default/files/docs/publication/r18hs017246-stepnowsky-final-report-2011.pdf
    January 01, 2011 - I Phase V Phase IV Phase II Phase III Figure 1: Overall Study Design Exclusion criteria. … I), at the Pre-intervention Assessment (Phase II), at the Post-intervention Assessment (Phase IV), … and at the 4-month (Phase V). … Given that each enrollee was part of the research study for 4 months (Phase I screening through PhasePhase II. Interventions. Equipment.
  15. digital.ahrq.gov/sites/default/files/docs/citation/ecare-plan-final-report.pdf
    November 01, 2022 - Phase 1 focused on understanding the problem, Phase 2 focused on requirement gathering and feedback, … • Phase 2—Requirement Gathering and Feedback. … • Phase 3—Input on the App Design/Usability and Implementation. … Each group met once per phase at a minimum. … – You will need to add your own signature/name and subject phase to the email. 2.
  16. digital.ahrq.gov/health-it-tools-and-resources/evaluation-resources/workflow-assessment-health-it-toolkit/all-workflow-tools/data-display
    January 01, 2023 - Data Display and Organization Event Tree Analysis Description An event tree analysis (ETA) examines the different paths that can be taken in a given scenario. Each step consists of a node and corresponding exit lines for each possible outcome at that step. The tool was origina…
  17. digital.ahrq.gov/sites/default/files/docs/page/johnson-success-story.pdf
    June 16, 2021 - • During the first phase of the project, a group of experts in pediatrics was convened with support … • During the second phase of the project, with support from AHRQ, an online database named STEPStools
  18. digital.ahrq.gov/health-it-tools-and-resources/evaluation-resources/workflow-assessment-health-it-toolkit/all-workflow-tools/simulation
    January 01, 2023 - Uses During the design phase of the system to assess specific functions or design features.
  19. digital.ahrq.gov/ahrq-funded-projects/using-social-knowledge-networking-skn-technology-enable-meaningful-use-ehr
    January 01, 2023 - In the development phase, an existing SKN system was enhanced to promote medication reconciliation, and … Next, in the pilot phase, the feasibility of using the enhanced SKN system in EHR workflow was assessed
  20. digital.ahrq.gov/ahrq-funded-projects/improving-safety-and-quality-outpatient-order-entry/annual-summary/2008
    January 01, 2008 - During the initial study phase, four outpatient primary care clinics, affiliated with Partners HealthCare … The implementation phase took between 8 to 12 weeks.

Search the AHRQ Archive

Information and reports more than 5 years old may be found in the AHRQ Archive site.

Search Archive

Search Within A Specific AHRQ Site

You selected to view results for the following site: