-
digital.ahrq.gov/principal-investigator/beebe-lora
January 01, 2023 - Intervention-Problem Solving (TIPS) for schizophrenia spectrum disorders: responses of stable outpatients over nine months … Intervention-Problem Solving (TIPS) for schizophrenia spectrum disorders: responses of stable outpatients over nine months
-
digital.ahrq.gov/sites/default/files/docs/citation/r18hs017046-krist-final-report-2011.pdf
January 01, 2011 - , and 16-months post initial
invitation to use the IPHR. … post-intervention), and March 2009 (16-months
post-intervention). … At baseline, 4-months, and 16-months post-intervention, we
determined the percentage of all eligible … We then calculated the
incremental change between baseline and 4-months and baseline and 16-months ( … Increases were observed at 4-months and in some
cases were still significant 16-months after patients
-
digital.ahrq.gov/health-it-tools-and-resources/workflow-assessment-health-it-toolkit/research/woods-k-et-al-2000
January 01, 2000 - This was accomplished with the addition of a single physician assistant during the last 12 months of … number of clinical encounters increased by 34% (from 1413 to 1889 encounters a year) from 1996 (the 12 months … The number of physicians remained constant, but a physician assistant was hired during then last 12 months
-
digital.ahrq.gov/sites/default/files/docs/citation/r18hs018932-hess-final-report-2015.pdf
January 01, 2015 - Patients answered detailed questions about their health behaviors and HRQoL at
baseline, 6, and 12 months … ,
and 12-months
2. … At baseline, 12-months, and 24-months, physician participants completed information regarding self-efficacy … , HRQoL, self-efficacy, and referrals Baseline 6-months 12-months 70 30
* … Activity
6 Months [median (IQR)] 1 (-5, 15) 2 (-2, 13) 0.70
12 Months [median (IQR)] 1 (-4, 10) -2.37
-
digital.ahrq.gov/sites/default/files/docs/page/THQITStoriesWeissman2010.pdf
December 31, 2007 - to use the e
prescribing software at no cost, a free handheld device to run
the software, and 6 months … research team tracked the prescribing patterns of participating
and nonparticipating physicians from 6 months … before the e
prescribing system was in place through 12 months after it was
implemented.
-
digital.ahrq.gov/sites/default/files/docs/publication/r01hs017939-carroll-final-report-2013.pdf
January 01, 2013 - for
developmental delay significantly increased the numbers of children screened at 9, 18, and 30
months … Participants
Patients younger than 66 months of age were automatically placed into either the control … Over 6,000 of
these kids received ASQs for routine developmental screening – 1,199 at 9 months old; … 1,166 at
18 months old, and 3,819 at 24 through 36 months. … These charts could be any visit not occurring in the 9, 18, and 30 months visits.
-
digital.ahrq.gov/ahrq-funded-projects/electronic-personal-health-record-mental-health-consumers/annual-summary/2012
January 01, 2012 - During the first 6 months of the intervention phase, a clinical care nurse helped patients access and … maintain use of their MH-PHR; during the second 6 months, patients used the MH-PHR without support. … collection was completed and included followup interviews for the 170 participants at baseline, 6-, and 12-months
-
digital.ahrq.gov/ahrq-funded-projects/electronic-personal-health-record-mental-health-consumers/annual-summary/2011
January 01, 2011 - During the first 6 months of the intervention phase, a clinical care nurse helps patients access and … maintain use of their MH-PHR; during the second 6 months, patients continue use without support. … Subjects participated in the intervention for 12 months with the final participant completing the trial
-
digital.ahrq.gov/sites/default/files/docs/phr-impact-chronic-disease-slides-012512.pdf
January 25, 2012 - CPAP Adherence Level (in hrs/nt)
Between UC and PC3 at 2 Months
p-value=.016; d-index = 0.34
CPAP … Adherence Level (in hrs/nt)
Between UC and PC3 at 4 Months
p-value=.016; d-index = 0.34
Nightly … Use Rates over
First 90 Days
Outcome Measures:
2 Months
Variable
Both
Groups
Mean ± SD … ■ No differences were seen between the
groups on outcome measures at 2 or 4
months. … Outcome Measures: 2 Months
Outcome Measures: 4 Months
Conclusions
Acknowledgements
Contact Information
-
digital.ahrq.gov/sites/default/files/docs/citation/r03hs028033-frey-final-report-2024.pdf
January 01, 2024 - Planned key outcomes included
total asthma-related hospital and ED visits within 6-months of discharge … Outcomes assessment:
We followed all subjects for six months. … We additionally collected EHR data on asthma-related
hospitalizations and ED visits within 6-months … at 6-months reaching the MCID
threshold. … (23%) had an acute visit within 6-months of enrollment.
-
digital.ahrq.gov/sites/default/files/docs/citation/r21hs027037-bozic-final-report-2024.pdf
January 01, 2024 - Patients were followed for up to 9 months. … ; higher levels of capability at 6-9 months; and greater
treatment concordance. … In the intervention group, levels of collaborative decision-making, capability at 3 months,
patient … and clinician satisfaction, consult duration, TKR rates, and decision regret at 3 months were not … (DRS 3 months 22.4 [20.0] versus 25.9 [20.4]).
-
digital.ahrq.gov/sites/default/files/docs/publication/r01hs015054-keenan-final-report-2008.pdf
January 01, 2008 - for our by our four Y1 units and at 12 months for our four Y2 units. … Y1 units (4); and at 12 months for the Y2 units (4). … unit and at around
15 months post with the six subjects from three of the three first year units. … 3-9 months
post go
live: M
3-9 months
post go
live: Range
of M for
units
15 months
post go … live : RNs
15 months
post go
live: M
15 months
post go
live: Range
of M
for units
Y1 (4
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs017276-burns-final-report-2011.pdf
January 01, 2011 - for 15 months after enrollment. … Has obtained glucometer strips within the prior 24 months
7. … ), 9 months, and 15 months. … Baseline measures for frequent and infrequent users between 3 months and 15 months
Measures
Infrequent … Patterns of Blood Glucose over 15
Months in Poorly Controlled T2DM.
3.
-
digital.ahrq.gov/ahrq-funded-projects/interactive-preventive-health-record-iphr-promote-patient-centered-care/annual-summary/2011
January 01, 2011 - Impact and Findings: At 4 months, the proportion of indicated preventive services that were received … Over 16 months, the proportion of eligible preventive services that were up-to-date declined in both … patients who were up-to-date with all 18 preventive services did not change significantly over the 4 months … At 16 months, however, the proportion of patients who were up-todate with all preventive services was
-
digital.ahrq.gov/sites/default/files/docs/resource/B5_Recruiting_Tool.pdf
June 16, 2021 - interview will be done weekly the first
month, then twice monthly, then once a month for the last four months … Two months after the wound heals, we’ll take a final picture to see if the
wound is still healed.
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs017034-chrischilles-final-report-2011.pdf
January 01, 2011 - after study assignment; 97.3%
were mailed between 6 and 6.5 months after assignment. … 2.5 (3.2) 2.3 (2.8) 0.3462 2.1 (2.5) 2.3 (2.3) 0.3196
Any change in Med Use -3
months:
286 … (35.7%) 94 (34.4%) 0.7138 349 (43.5%) 124 (45.4%) 0.5839
Any change in Med Use -3
months: Start Rx … med
155 (19.3%) 48 (17.6%) 0.5248 190 (23.7%) 56 (20.5%) 0.2803
Any change in Med Use -3
months … 2.4 (2.1) 2.5 ( 3.4) 2.3 ( 2.6) 2.1 ( 2.5) 0.10 (0.23)
Any change in Med Use -3 months: 48
(37.2%
-
digital.ahrq.gov/sites/default/files/docs/citation/r01hs022677-stockwell-final-report-2019.pdf
January 01, 2019 - The primary outcome was series completion within 12 months. … be consistent with the now two-
dose recommendation in both phrasing and timing (2nd dose now due 6 months … after the first
instead of 2 months and is now the last dose). … or older or b) at less than 15 years of age but had
already received their 2nd dose less than six months … Outcome Measure:
The primary outcome measure was the timely HPV vaccine series completion within 12 months
-
digital.ahrq.gov/decisionmaker-brief-computerized-provider-order-entry-cpoe
January 01, 2023 - Several AHRQ projects spent 6 to 8 months developing order sets. … AHRQ-funded projects reported implementation delays ranging from 6 to 18 months. … CPOE system selection took up to 6 months for some projects.
-
digital.ahrq.gov/ahrq-funded-projects/maintaining-activity-and-nutrition-through-technology-assisted-innovation
January 01, 2023 - weight change of greater than 10 pounds from enrollment weight, and annual progress reports at 12 and 24 months … Outcomes were measured at baseline and 6, 12, and 24 months. … At 24 months, 65 percent of intervention and 49 percent of control patients had maintained the 5 percent
-
digital.ahrq.gov/sites/default/files/docs/citation/r01hs025071-schnall-final-report-2022.pdf
January 01, 2022 - A number of secondary outcome measures were collected at baseline, 3 months, and 6
months. … , and 6 months. … (P = .81) and 6 months (P = .11). … (declined 16.2%, P = .04) and 6
months (declined 25.4%, P = .01). … (increased 0.38 points, P = .0002) and 6
months (increased 0.39 points, P = .0002).