-
digital.ahrq.gov/sites/default/files/docs/citation/r21hs022911-chaudhry-final-report-2017.pdf
January 01, 2017 - eligible patients we were able to identify
patients who had the recommended service complete at four months … primary care provider we were able to identify patients who had the recommended
service complete at four months
-
digital.ahrq.gov/sites/default/files/docs/citation/pccds-ln-opioid-action-plan-2019.pdf
January 01, 2019 - Over
the ensuing months, additional members
identified through OAP development efforts
were added … Over
the ensuing months, additional members
identified through OAP development efforts
were added … She next looks up
patients who do not have appointments in the
next two months and who the clinic … PDMP check (8), last urine drug
screen, medications that could increase
overdose risk, and other … background
so that clinician will not be interrupted
with an OUD screening notification for
three months
-
digital.ahrq.gov/sites/default/files/docs/care-transitions-slides-092619.pdf
September 26, 2019 - COMPLEXedex™ Clinical Algorithm
• Practice sent SON
medical record
number and diagnoses
from last
-
digital.ahrq.gov/sites/default/files/docs/publication/r21hs020323-mollica-final-report-2014.pdf
January 01, 2014 - mainstream American patients demonstrated the
positive relationship between trauma events, PTSD (≥ 6 months … knowledge was
intermediate, they had seldom played computer/videogames or medical simulator during the last … During the last 5 years I have played
computer/videogames
2,50 2 2
3. … During the last 5 years I have been
training with some kind of medical
simulator
2 2 2
4.
-
digital.ahrq.gov/sites/default/files/docs/citation/r01hs021261-shapiro-final-report-2018.pdf
January 01, 2018 - The last part of the data analysis included measuring frequent ED users (patients with ≥
4 visits in
-
digital.ahrq.gov/sites/default/files/docs/citation/HealthITHazardManagerFinalReport.pdf
May 01, 2012 - The Hazard Manager report function was added in August 2011, 4
months after the beta-test began. … Despite
months of negotiations, the vendor has not removed the hazard. … In Hazard Manager 2.0 the user profile includes the following information:
• First and last name
• … Manager 2.0 Discovery tab were relocated from
a priority position at the top of the screen to the last … Hours (up to 23): ____ [open text field]
Days (up to 30): ____ [open text field]
Months: ____
-
digital.ahrq.gov/sites/default/files/docs/TRANSCRIPT%20OF%20LEVERAGING%20HEALTH%20INFORMATION%20TECHNOLOGY%20FOR%20PATIENT%20EMPOWERMENT_1.pdf
April 08, 2010 - We have had a fully functional electronic health record for the last seven years. … things we are currently doing is we have a hospital-to-home program, and we initiated this
about six months … It would say, "Your
patient last had their blood pressure checked on this date, this is the value. … An example might be a patient that was seen two months prior for a wellness visit, but still has not … In this study by Jencks, et al., which is published in the New England Journal of Medicine last year,
-
digital.ahrq.gov/sites/default/files/docs/publication/r21hs021781-kelchner-final-report-2014.pdf
January 01, 2014 - The daily practice sessions were designed
to last approximately 10-15 minutes and timed out (if no … The home practice sessions
were designed to last approximately 10-15 minutes. … As we are within two
months of this study’s completion, the full range of data (including the final
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs018646-gance-cleveland-final-report-2014.pdf
January 01, 2014 - and chart audits were conducted at baseline (T1), after competition of the
training (T2), and six months … Staff provided the last three digits of the
medical record identification number to the statistician
-
digital.ahrq.gov/sites/default/files/docs/publication/uc1hs015258-aders-final-report-2007.pdf
January 01, 2007 - Satisfaction surveys were distributed four months after access to the
EMR was achieved. … Site surveys were completed by 7 practice sites at the last time point (70% of 10 MHMC
sites at conclusion
-
digital.ahrq.gov/sites/default/files/docs/transforming-guidelines-action-slides-06152023.pdf
June 15, 2023 - review
• Fall risk screening
(portal)
• Initial intake
• Risk assessment
• Meds
• Changes since last … patients meeting 2013 USPSTF criteria with no chest CT in past
year who had not declined screening in last
-
digital.ahrq.gov/sites/default/files/docs/citation/r21hs024124-meguid-final-report-2018.pdf
January 01, 2018 - INCIDENCE:
Despite a significant drop in rates of
perioperative mortality and morbidity over the last … The last one they tell you is, of course, death.
-
digital.ahrq.gov/sites/default/files/Innovation%20Center%20Q3%202024%20Progress%20Report.pdf
October 09, 2024 - projects in real-world settings to ascertain best practices for implementation and
monitoring to ease last … Over the next three months, Core 1 and Core 2 will propose new project ideas for the
fourth year and
-
digital.ahrq.gov/sites/default/files/InnovationCenterQ12023ProgressReportDraft.pdf
January 01, 2024 - projects in real-world settings to ascertain best practices for implementation and
monitoring to ease last … Over
the next three months, Core 1 will deliver the final PC CDS workflow execution models and
performance
-
digital.ahrq.gov/sites/default/files/Innovation%20Center%20Q4%202023%20Progress%20Report_508_01052024.pdf
February 07, 2024 - projects in real-world settings to ascertain best practices for implementation and
monitoring to ease last … Over the next three months, Core 1 will finalize the cross-cutting assessment of AHRQ-
funded PC CDS
-
digital.ahrq.gov/sites/default/files/docs/publication/uc1hs015319-sullivan-final-report-2007.pdf
January 01, 2007 - The prescriptions
representing the pre-implementation timeframe were hand-written a minimum of six months … those representing the post-
implementation timeframe were electronically written a minimum of six months … office setting and
found that the time required for most administrative tasks decreased within six months
-
digital.ahrq.gov/sites/default/files/docs/citation/r21hs025000-liss-final-report-2019.pdf
January 01, 2019 - Study follow-up lasted four months.
-
digital.ahrq.gov/sites/default/files/docs/citation/r18hs026198-kawamoto-final-report-2022.pdf
January 01, 2022 - trial: 55 to 80 years old, 30+ pack-year smoking history, and current smoker or quit smoking in
the last
-
digital.ahrq.gov/sites/default/files/docs/publication/modeling-pcmh-principles-attributes-patient-experiences-narrative-report.pdf
November 01, 2014 - The last two
elements, process flow and specific data elements,
were outside the scope of this project … Natalie has been experiencing worsening sadness over the last few months. … Johnson is surprised to see the lab values from his visit just
last week with Dr. … She has a chronic cough but notes that it
has become productive of purulent sputum in the last 3 days … Stool is grossly bloody and hemoglobin
is 6.5 (had been 12.5 3 months ago). Dr. Prima contacts Dr.
-
digital.ahrq.gov/sites/default/files/Innovation%20Center%20Q4%202024%20Progress%20Report_02.21.25.pdf
February 03, 2025 - projects in real-world settings to ascertain best practices for implementation and
monitoring to ease last … Over the next three months, Core 1 will finalize the AI-based PC CDS review
and submit a Viewpoint manuscript