digital.ahrq.gov/sites/default/files/docs/citation/r01hs020909-dixon-final-report-2017.pdf
January 01, 2017 - Quantitative Data Collection
The following data were collected at baseline (retrospective to 12 months … prior to introduction of the
intervention) and at 6-, 9-, and 12-months after implementation of standard … workflow of reporting prior to and after the intervention were
collected during baseline and at 12-months … However, reports were not delayed more than 120 days (4 months) at the intervention clinics when
compared … The last mile: Using fax machines to exchange data
between clinicians and public health.
-
digital.ahrq.gov/sites/default/files/docs/hit-cdm-transcript-062111.pdf
June 16, 2021 - And then we are now, of course, in our last dot here
on the graphic where we are analyzing our data … The last lesson learned here is that cross-institutional studies require trust. … And
so this is the paper that… Actually I saw Helene at the Academy Health Meeting in
Seattle last … The last slide here is what we’re learning. … Eastern standard on my
time so I think I have the last question.
-
digital.ahrq.gov/sites/default/files/docs/page/PHTMA.pdf
December 01, 2004 - Physicians
were observed a mean of 3.3 months prior to LMR
implementation and 7 months after implementation … a return to original
levels by 18 months. … Last accessed:
July 1, 2004.
[37] Folz-Murphy N, Partin M, Williams L, Harris CM, Lauer MS. … Last accessed: July 1, 2004.
[48] Cimino JJ, Patel VL, Kushniruk AW. … Last
accessed: July 1, 2004.
[51] Institute of Medicine.
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs017270-fricton-final-report-2011.pdf
January 01, 2011 - of two clinical decision support approaches for patients with
medically complex conditions during 6-months … before implementation and 12-months after. … that ranged from 79 to 90 percent of all dental care providers, this was not sustained during the
last … three months of the study. … after implementation of the CDS system and the second six months after implementation (that is,
months
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs017035-mehr-final-report-2011.pdf
January 01, 2011 - For example this patient’s last blood pressure was 114/65, which met the quality
indicator standard. … Perceptions of users of IQHealth were also assessed 3-6 months after
enrollment. … the 163 enrollment survey
respondents (55% response), 50% had e-mailed their physician within the last … Follow-up
survey respondents who reported using IQHealth had not used it much over three months. … Washington D.C.: AARP, Last updated 2007.
-
digital.ahrq.gov/sites/default/files/docs/citation/r01hs025405-schmajuk-final-report-2024.pdf
January 01, 2024 - adherence: a single item (“How many times do you think you may have missed
taking your pills in the last … ) 24 (8.8)
Other 17 (2.1) 3 (1.1)
Baseline clinical characteristics (closest record from an “18
months … prior and 2 months after” window to the patient's first
survey)
CDAI, n 427 202
moderate or … for medical
researchers requires careful planning and submission of grant proposals to fund the work months
-
digital.ahrq.gov/ahrq-funded-projects/use-hit-increase-primary-care-access-medicaid-patients/annual-summary/2012
January 01, 2012 - As last self-reported in the AHRQ Research Reporting System, project progress and activities are completely
-
digital.ahrq.gov/sites/default/files/docs/survey/pcip-evaluation-provider-survey.pdf
June 16, 2021 - Using an EHR will cause a
patient visit to last longer
32.
-
digital.ahrq.gov/sites/default/files/OY1%20Stakeholder%20Center%20Operational%20Framework.pdf
September 01, 2024 - products, which align
with the expected level of efforts outlined by AHRQ (i.e., level of effort is 4-6 months … [Level 3] or 9-11
months [Level 2] for product development). … quarterly reports on Workgroup progress that
summarize:
■ Actions taken by Workgroups since the last
-
digital.ahrq.gov/sites/default/files/docs/survey/provider-pre-implementation-survey.pdf
June 16, 2021 - Time since last visit [ ] [ ] [ ] [ ]
q. … A summary of the patient’s clinical values
for the last year presented in a table
[ ] [ ] [ … A summary of the patient’s clinical values
for the last year presented in a graphical
format
[
-
digital.ahrq.gov/sites/default/files/OY2%20Innovation%20Center%20Operational%20Framework_508.pdf
November 01, 2024 - Planning Committee Meetings and Communications
The Planning Committee will convene virtually every four months … ■ A summary of activities taken by each Core since the last report
■ Individual project updates … design principles
■ Accelerate development and use of data
interoperability standards that reduce last
-
digital.ahrq.gov/sites/default/files/docs/publication/r21hs020696-ballard-final-report-2013.pdf
January 01, 2013 - practices met study inclusion criteria and 29 had implemented the EHR before
the first day of the last … Diabetes Quality of Care Measures [2002]: ICD-9-
CM Diagnosis Codes 250.xx) during the preceding 12 months … Education” tab recommendations appear directly below the relevant measure (for
example, if the patient’s last … compared with 12 months of implementation for the average patient seen in year 5, and
report this as … 1784 ( 18.3) 1742 ( 21.5) 1686 ( 24.2) 1650 ( 26.6)
EHR 627 ( 7.8) 4288 ( 61.6) 5102 ( 82.2)
* last
-
digital.ahrq.gov/sites/default/files/docs/publication/r01hs015413-samore-final-report-2008.pdf
January 01, 2008 - However, two of the clinics in group B withdrew from the study within 2 months after launching
use of … A total of 57 providers used the
CCOE tool for at least 3 months. … of algorithms completed was 40% during the first month of
implementation and declined to 2% by the last … Baseline rates of potential DDI
Group A clinics
pre-CCOE
# DDI per 100
person months:
Overall … months:
Range across clinics
Coumadin DDI 5.5 2.3-20.0 16.3 8.7-29.5
Statin DDI 2.4 1.0-12.5 2.6
-
digital.ahrq.gov/ahrq-funded-projects/implementation-outcomes-health-it-program-vulnerable-diabetes-patients/annual-summary/2012
January 01, 2012 - As last reported in the AHRQ Research Reporting System, progress was completely on track and spending
-
digital.ahrq.gov/ahrq-funded-projects/barriers-and-facilitators-implementation-and-adoption-ehr-home-care/annual-summary/2011
January 01, 2011 - As last self-reported in the AHRQ Research and Reporting System, project progress and activities are
-
digital.ahrq.gov/sites/default/files/docs/publication/uc1hs015135-arora-final-report-2008.pdf
January 01, 2008 - very rapid
among new IV drug users, with approximately 45-70% becoming infected within the first 6
months … Of the last 80 patients managed by our disease management team,
only three have dropped out of the program … Of the 179 subjects
completing treatment, 98 (55.1%) have reached 6-months of follow-up with a sustained … Hepatitis C treatment is lengthy and some patients may remain on treatment for eighteen months. … evaluated through intensive written surveys
administered at baseline and repeated after every six months
-
digital.ahrq.gov/sites/default/files/docs/resource/Dataform_4_ADE_Incident_Identification_Form.pdf
June 16, 2021 - How long did it last? ____ 1.
-
digital.ahrq.gov/sample-questions-answers-1
January 01, 2023 - The last article describes the effect on resource utilization:
Settings : Six internal medicine wards
-
digital.ahrq.gov/sites/default/files/docs/citation/healthitandlaborders.pdf
November 01, 2011 - Data taken from 6 months prior to the implementation of the EHRS
were compared to data 6 and 12 months … post implementation and in some cases 20 months
postimplementation. … Lab test guideline compliance measures
Patients With HIV Frequency
Viral Load 3 months
CD4 count … Guideline compliance rates for HIV lab test
Pre
EHRS
6
Months Post
EHRS
12
Months Post … The process of identifying and resolving these issues may take many
months.
-
digital.ahrq.gov/sites/default/files/docs/publication/r18hs017017-logan-final-report-2009.pdf
January 01, 2009 - Reports were created monthly displaying
aggregate information on the prior 6 months of data for the … This was to be distributed for 18 continuous months.
• Group 2. … This was to be distributed for 12 continuous months then
stopped to determine if the improvement in … all measures was
collected twice: during the preintervention phase January – June 2008 and for the last … 6 months